Important Info
All Hire desktop list data will automatically update intermittently when the ‘Auto Refresh’ box is ticked.
New Features
As PR v192.1.1, January 3, 2020
Create service cases for hire order delivery/collection when Service module is installed and tick-boxes checked in Hire Order Maintenance.
As PR v192.2.2, March 26, 2020
Hire Transfer maintenance functionality/menu option added.
Job Costing references now named Projects, although job label name is used for backward compatibility.
As PR v192.3.2, March 31, 2020
Service case assigned employee added to Settings screen ‘Service’ tab (only shown when the Service module is installed). When configured delivery/collection cases created in Service will be assigned to this employee. If no employee is configured these cases will be unassigned.
As PR v192.4.2 / v192.5.2, April 2, 2020
Rapid Hire Order entry/amend screens now include Attachments and Memos tabs.
Issues Resolved
As PR v192.3.2, March 31, 2020
Asset Hire Details Inspection History tab fix for ‘object reference is not set ..’ error if the examined by user has since been deleted from Sage.
As PR v192.4.2 / v192.5.2, April 2, 2020
If hire suspension period includes excluded bank holidays do not reduce chargeable duration for these dates twice.
As PR v192.6.2, April 8, 2020
Rapid Order Entry/Amend will now show the batch asset description if a single batch asset is assigned to a hire order line.
As PR v192.7.2, April 15, 2020
Suspension/bank holidays overlay checks fix to deal with non-day (e.g. week) hire periods.
Suspension dates now include end date when weekends are excluded.
Date applied: May 11, 2020