221.0.89
Issues Resolved Change in FunctionalityIssues Resolved
Works Order Processing
- [#13523] On the works order completion screen only attempt to close child works orders associated to the selected works orders that are fully booked.
- [#13645] Removed ‘Manning level’ from increasing/decreasing the time it takes to complete an operation.
- [#13880] Notify user that supplier has not been set for sub contracts when selecting subcontract operations for a works order or maintaining it or adding it to a BOM.
- [#14356] fix when adding time to a labour operation that has been manually added to a works order. [“Unable to update the object (Sage.Manufacturing.BusinessObjects.BillOfMaterials.BomOperationResourceDataObject, ), as the object has been deleted”]
Material Resource Planning
- [#13168] Fix to ensure any works orders that contain phantom items which themselves contain sub assemblies follow the ‘Create selected works order only’ setting. Issue where users would still get the popup to create a sub assembly for these lines even when they were not ticked on the ‘Suggested Works Order’ tab.
- [#13711] Fix for purchase orders being suggested a day or 2 days after they are required if the required date is a Saturday or Sunday and the MRP setting for supplier lead times.
- [#13744] The refresh button on capacity planner rough cut teams tab will refresh the labour availability the charts of all teams.
- [#14487] Fixed an issue when running MRP and it would error running suggested works orders when rescheduling is enabled [“Object Reference Error”]
Kitting
- [#13592] Allow the bin priority 6 bin to be available for picking.
Change in Functionality
Works Order Processing
- [#14306] Added a new stock item setting to determine the way works orders are numbered when they are split by batch size. This requires that both ‘Auto generate WO number’ and ‘Use standard WO number’ settings are enabled for this to be applied.
Date applied: March 26, 2025