Manufacturing

Back to release notes

221.0.85

Issues Resolved
Issues Resolved

Works Order Processing

  • Fix to post material overhead postings when completing a works order so that there is not a negative value left in WIP. [#11272]
  • Fix to calculate operations times at the end of creating a full works order structure to improve the performance of creating a works order. [#12186]
  • Fix traceable item use/sell by dates lost when booking in finished goods from barcoding. [#12357]
  • The add extra quantity works order material setting also applies to subcontracts and finished items. [#12525]
  • With simple timesheet works order setting, recording the full quantity can complete the associated operation and adjust the area on the work order for the next operation [#12690]
  • Fix to tick any traceable items that are going to be issued when issue works orders and selecting traceables at despatch is turned on. [#12702]
  • Fix to allow ‘Bulk Issue’ items to be unissued when they have been issued at the point of booking with the setting ‘Issue bulk issue items at booking’ is enabled. then the works order is unbooked. [#12832]
  • Update the message box displayed when changing promised dates on a sales order where a works order is linked to inform the user the date can only be set if the works order operations allow this to happen. [#12833]
  • Fix for ‘Sub contract’ and ‘Non stock’ costs being included in the cost of a works order when the setting to include either of these costs was not turned on. Issue could be seen where ‘calculate cost’ would produce a different result to the drilldown. [#12837]
  • Fix to ensure the ‘WOCost’ field on ‘SiWorksOrder’ is set to 0 when the works order status is new. issue where ‘New’ works order could not be deleted as there was a cost still left in this field. [#12901]
  • Exclude completed works orders from selection when adding to a bulk issue. [#12922]
  • Fix to set the ‘StockItem’ on a works order when importing works order lines and there is a finished item so that the associated project transactions are set correctly. [#12958]
  • Fix to check the ‘Default for component warehouses’ instead of the ‘Default when component’ stock item setting when generating a works order from sales order, to set the ‘Default component’ warehouse on a works order. [#12985]
  • Fix to correctly enable and disable the project control when there is no finished item and a works order line has been issued or time has been added against Labour/Machine lines. [#13139]
  • Fix to improve getting sales order details that are associated to works order to help with searching on the works order desktop list. [“Database timeouts”]

Material Resource and Planning

  • Fix for ‘Future Stock Movements’ and ‘Suggested Stock Transfer’ quantities to handle when stock transfer item has been allocated to multiple times. [#13000]
  • Fix for inflated kitting suggestions when a kit is part of another kit and the parent kit is on a sales order and then there is active kits within the system. [#13090]

Kitting

  • Fix for full ‘Labour/Machine’ postings being posted when a kit is part built. [#12811]

Date applied: January 29, 2025