Works Order Processing

  • Fix for Sage closing abruptly when backflushing a works order with a large number of sub assemblies.
  • Fix to not leave a traceable item as ‘reserved’ when originally booking a finished item that requires a backflush but the backflush does not complete.
  • Fix to only enable the ‘batch print’ and ‘Update from BOM’ buttons on the works order screen when the user is able to use them. issue where these were enabled before the works order was created causing an error when pressed. [“Object reference error”]
  • Fix to use the correct price when creating pos from a works order and using eps (POP008) function ‘Supplier quantity price breaks’ and the supplier is in a foreign currency.
  • Fix for stock item settings not being correctly loaded when switching between items.
  • Fix for ‘Miscellaneous’ items not working correctly when they haven’t been confirmed and the cost of them is included in the finished item with the settings ‘reduce line quantity when booking’, ‘remove unused lines when booking’ and ‘zero unneeded lines when booking’. Issue would occur where the cost of miscellaneous items were being included when they were not confirmed and a works order would be booked and completed.
  • Fix for ‘Fixed length quantity’ being ignored when creating a works order. Issue when a larger quantity was entered and the operation quantity would be set via the works order quantity, causing inflated operation times.
  • Fix when creating a works order with operations and there is a fixed length but no fixed quantity. [“Attempt to divide by 0”]
  • Fix to correctly set a works order due date when the setting ‘Only use production lead time for works orders’ is enabled and the date would go further back than today’s date.
  • Fix to not allow a works order to be split if a miscellaneous item has been ‘Confirmed’ on it.
  • Fix when viewing the work in progress (summary) report and the machine costs would be shown as the same as the labour costs.

Material Resource Planning

  • Fix for MRP stock settings not remaining when switching between tabs on a stock item.
  • Fix to set the correct delivery address when creating a stock transfer from MRP (Suggested Stock Transfer) so that it is set as the destination warehouse.

Kitting

  • Fix to display the traceable information popup when building a traceable kit item when the traceable generation type is not ‘Do not generate’ and the item has ‘Has Compulsory Attributes’ or ‘Uses Use by Dates’ or ‘Uses Sell by Dates’ or ‘Uses Alternative Refs’.
  • Fix to correctly populate the finished item bin on a kit. Issue attempting to build a kit and the finished item bin was not set correctly.