221.0.54

Issues Resolved Important
Important Info

ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v22.1 FOR THE FIRST TIME.  THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.

TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.


Issues Resolved

Works Order Processing

  • Fix to return the stock item default component warehouse for a sub assembly suggestion so the correct demand warehouse is checked when running MRP. Issue when sub assemblies were being incorrectly suggested when there is stock available
  • Added scripting to the ‘Timesheet (Single User) ‘ screen within the Projects menu, so that the user can select ‘Works Orders’ when entering a timesheet
  • Fix to correctly filter the traceable enquiry when selecting ‘Sicon Works Orders’ and component traceability is turned on

Material Resource Planning 

  • Fix when opening the ‘Future Stock Movements’ screen from MRP when the use has selected to use ‘Warehouse Hierarchy’ to also pass through the dates selected otherwise the information outside of the MRP run dates will be displayed

Date applied: January 31, 2024