221.0.47
Issues Resolved New Features ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v22.1 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
New Features
Material Resource Planning
- Added the ability to select multiple follow up types when filtering the MRP results screens
- Added a new setting for production lead times to allow suggested works orders generate for weekends
Issues Resolved
Works Order Processing
- Fixed issue where the cost of the works order line was not updating if when an purchase invoice is recorded for the stock of the works order line. This is if unconfirmed costs is on and we are updating at invoice, and if nominal integration is off.
- Refresh on amend works order screen was not updating the issued cost field after a purchase order was invoiced.
- Fixed the persistence of setting ‘Print Labels when items are reserved serials’
- Fixed update BOM record via web API when version control is enabled. It wasn’t finding the correct BOM version.
- When the description of the labour resource was changed in Sage manufacturing register, then the description on the Sicon team was not updated.
- Fix to correct the labour/machine postings made to a project when there is no finished item
- Fixed issue with project costing using new single project cost transaction, where the committed cost was calculated incorrectly if there was labour estimate and actual transactions involved.
- Fix when reducing a works order quantity to default the batch allocation quantity for a works order line to the reduced quantity when there is only one batch
- When creating a sub assembly on a works order, the popup to create the sub assembly was appearing multiple times if the user had changed companies multiple times.
- When deleting the preallocation for a works order to sales order on the amend works order screen, the link from the works order to the sales order line was not removed. It now removes this link and therefore no longer displays the sales order number on the works order header.
- Fix to correctly set the sub assemblies due date when the parent works order start date (which can be set through operations)
Date applied: November 29, 2023