220.0.9
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v22 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to only deleted the selected preallocations when a line has multiple preallocations. CASE23519
- Fix to the multi selects to hold onto the changed values on opening the multi select on the second time, and to remove multi selects when removing the machine from the multi select. CASE23009
- Fix to send back the correct multi resource selection.
- Fix to not post stock against a project if the project is the N/A project.
- Fix to scrap traceable items with component traceability.
- Fix to handle the min/max batch sizes better when you don’t split by max batch size and you enter a works order quantity above the maximum batch size but below the next minimum size. CASE22075
- Fix to handle when a remainder is 0.
- Fix to speed up opening the disassemble kit form when there are a large number of kit templates. CASE22057
- Fix to get the correct value for the actual overhead recovery cost. CASE23492
Material Resource Planning
- Fix to stop error when BOM is suspended for a default built built/bought item. CASE23547
- Fix to add all the reasons to the original reason record when creating suggested purchase orders. CASE23582
- Speed improvements made to loading the suggested PO tab and the suggested stock transfer tabs. CASE16660
Date applied: October 10, 2022