220.0.3
Issues Resolved New Features ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v22 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
New Features
Works Order Processing
- Sub contract hours offsite as operation duration
Issues Resolved
Works Order Processing
- Fix to stop error when changing due date when the bill of materials drop down can’t locate the bill of materials.
- Fix to get the sage works orders to display in the traceable enquiry screen.
- Use the sub contract lead time as the duration of the operation.
- Fix to stop error with project integration and working with works orders that are not pre-allocated to a sales order.
- Fix to get the default available hours when a team doesn’t have any resources.
- Fix to return the minimum batch size when works order quantity is less than the minimum batch size
- Fix to stop creating JC posting for sub assemblies.
Kitting
- Fix to ensure allocations are completed.
- Fix to stop divide by zero error when adding a component of zero cost to disassemble kit.
- Fix to stop build being allowed when service item doesn’t have a warehouse selected when use allocations is disabled.
Material Resource Planning
- Speed improvements made when loading the information on the suggested works order tab.
Date applied: October 10, 2022