220.0.21
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v22 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to correctly calculate the cost of a purchase order line for a sub contract when the supplier is in a foreign currency.
- Updated the Manufacturing dataModel missing table: SiWorksOrderAllocationLines.
- Fix to update the old quantity value after editing the finished item quantity, otherwise this became out of sync and if the user changed the WO quantity, all other values were then incorrectly worked out.
- Fix to importing serial numbers to be used when booking an item in with auto generate serial numbers turned on, to be able to use the imported serial numbers when booking in.
- Fix to always fall back to the default staging when creating works orders if no stage has been set on the works order.
- Fix to calculating the sub contract operation dates when converting an estimate to a works order, and no sub contract line has been found.
- Fix to use the dates entered when importing works orders.
- Fix to read the associated lines to a works order before checking if any lines are allocated or issued to make sure they are up to date.
Date applied: December 30, 2022