220.0.15
Issues Resolved New Features ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v22 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
New Features
Works Order Processing
- Added settings to switch off the stock issue to projects and to set the internal area that the costs are posted to during a project issue.
Issues Resolved
Works Order Processing
- Fix to use the correct cost when unbooking, when the cost hadn’t been calculated. We will now calculate the cost on unbook.
- Fix to stop double applying the exchange rate when invoicing a PO.
- Fix to get the sub assemblies when filtering works orders.
- Fix to reduce preallocations when line quantity is reduced.
- Fixes to double exchange rate costs
- Fix to pre-allocation pop up appearing anyway when backflushing and “Do not ask to allocate preallocated lines” is ticked within settings
- Fix to stop error when part booked preallocation has been deleted for works order associated to a project.
- Fix to use the unconfirmed quantity remaining on associated movement balances rather than the bin item unconfirmed quantity for actual costed traceable items.
- A data fix button has been added that will re-add an unconfirmed movement balance and complete it, if the works order had previously been completed and the correct number of items didn’t get created as movement balances. This only works with unconfirmed costs and actual traceable items.
- Fix to use the correct cost when unbooking, when the cost hadn’t been calculated.
- Fix to stop error when saving works order settings after quarantine warehouse has been deleted.
- Fix to stop eco batch size form appearing when not creating a new sub assembly.
- Fix to internal area & scrap write off lookups on the costs & nominal so users can now type into text field
- Fix to stop object reference error when adding operations to estimates.
- Fix to set the unbook cost before the unbook process is started to ensure the correct cost is used.
- Fix for subassemblies that are not preallocated, now cannot be selected once ‘select all’ button is clicked.
- Fix to show settings screen when accessing the works order form when project integration is enabled, issue project to stock enabled and no internal area set for the project issues.
- Fix to use the correct phantom component quantity when getting the BOM lines from the BOM explosion coordinator.
Material Resource Planning
- Fix to stop error when saving the MRP settings when quarantine warehouses exist for deleted warehouses.
- Fix to exclude kit line items that have no warehouse location.
- Fix to create minimum stock suggestions at the correct time.
- Fix to create Min stock MRP recommendations when you have a live PO.
Date applied: December 30, 2022