211.0.8
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v21.1 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to enable the change reason dropdown when updating the UOM quantity field.
- Fix to show wo number on finished item line when exclude sub contract components is selected
- Fix to ensure the same machine is used across all phases of an operation.
- WO Quantity not dividing correctly when changing the qty of finished item (CASE 17298)
- When viewing works order comments through the stock item balances screen the tab was not loading (CASE 17132)
- Traceable items not displaying when scrapping a component on a WO with a name longer than 20 characters, additional fix to display all issued components when components are issued multiple times (CASE 16030)
- Added a check for despatched subcontract PO’s when deleting PO’s, if the subconcontract has been despatched it can not be deleted – CASE (16758)
Kitting
- Fix to stuck serials when using Stock/Kit from a sales order purchase (CASE 15365)
Date applied: January 11, 2022