211.0.31
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v21.1 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to show preallocated works orders when the line is not a sub assembly works order line.
- Fix to not include cost of non stock items or sub contract items when using get cost of works order.
- Fix when adding multiple lines to an existing purchase order when exclude sub contract components setting is enabled.
- Fix to backflush via API when misc items are on sub-assemblies and sub-assembly items have no child works order.
- Fix to when booking multiple finished items after manually changing the cost percentages.
- Fix to stop error if sequence number is not the same as the index of the grid.
- Fix to show correct message when minimum or maximum batch size hasn’t been set.
- Fix so the icons display correctly.
Date applied: December 30, 2022