Manufacturing

Back to release notes

211.0.13

Issues Resolved Important
Important Info

ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v21.1 FOR THE FIRST TIME.  THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.

TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.


Issues Resolved

Works Order Processing

  • Subcontracts not excluding component lines, this lead to PO’s lines not generating correctly and therefore not being deleted when the PO line is deleted. (CASE 18288)
  • Fix to add cost when adding sub contract to an existing works order. This will also change the cost if the quantity is amended when adding the finished item.
  • fix to subassembly allocating and creating subassembly at the same time.

Date applied: February 18, 2022