210.0.9
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v21 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to bin selection when using warehouse hierarchy.
- Fix to the report Works orders in progress (Nominal) to include the narrative ‘Out / Manufacturing’ in the results
- Add project changing to works order history.
- Fix to the works order enquiry on the projects screen to stop unlinked works orders appearing.
- Fix to an object reference error being shown when creating multiple stock items without closing the stock items form.
- Updated the works order status to display correctly and automatically refresh the view in Sage when allocating to a works order from goods received.
- Fix to stop allowing different quantities to be issued than what is required when backflushing.
- Fix to show better error message when cancelling out of the issuing process when backflushing traceable items.
- Fix to stop freezing on allocate and issue from the backflush screen when backflushing multiple works orders using the restart backflush button.
- Removed comment type sales order line from generate works order for non built items.
- Fix to the issue causing duplicate works order numbers for sub assemblies added to a works order after creation.
- Fix to filter fully received items correctly when the checkbox is used in sub contract management.
Material & Resource Planning
- Improvements to reschedule messages.
Date applied: August 12, 2021