210.0.6
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v21 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to use model when returning create works order from bom
- Fix to copy operations when copying Templates and Estimates
- Fix to update the preallocated quantity to the updated sales order quantity when changing works order quantity
- Fix to stop nominal postings being made for traceable works order finished items when integrate stock with nominals is disabled
- Fix to reduce the traceable allocation balance when part issuing a batch item
Material Planning
- Performance improvements to sales over lead time calculations
- Fix to an issue that caused Material Planning to not finish
- Fix to correct some suggestions having minimum stock as a reason incorrectly
- Fix to creating sub assembly suggestions for items with an economical batch size where not all children were correctly linked to their parent
- Fix to the issue that caused inconsistent results when checking for preallocations on demand movements
- Fix to performance problems on the expediting screen
- Fix to use the Sicon MRP tab UOM override on purchase orders converted from suggestions
Date applied: July 16, 2021