210.0.42
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v200.0.9 OR HIGHER FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Added a check to to see if a BOM is on hold before creating a new quotation line, if it is on hold it will pop up a message and return (CASE 18665)
- Fix to enable the warehouse hierarchy override editing an item.
- Added check against standarditemlink and BomItemType when creating an estimate
- Fix to future buy price calculations on subassembly line – (CASE 19637)
- Fix to set the overhead recovery to equal the amount multiplied by the quantity
- Fix to stop sub assemblies being created from phantoms when they are not required. CASE19193
- Changed bulk issue to use quantity format as there was an issue rounding up stock levels when checking if enough stock is available to allocate
Kitting
- Fix to stop reserving quantities on issuing error.
Date applied: March 28, 2022