210.0.20
Issues ResolvedIssues Resolved
Material & Resource Planning
- Fix to show warnings and reschedule messages when opening previous MRP results
- Fix to include the description the project reference and restrict to 64 characters.
Works Order Processing
- WO – stopped object reference when no nominal is set with overhead(CASE 15118)
- Subcontract screen now pulls through misc items, select and deselect buttons have also been added to the screen
- Fixed error with operation expected hours calculating second incorrectly (J1351 Issue 10)
- Tidied up Tab functionallity for serial creation, created option for printing labels for reserved serial numbers
- excluded completed WO from process stock to work order lines (CASE 15158)
- AutoAllocateAcrossMultipleWarehouses setting is now used correctly (CASE 15034)
- Fix to issue allocations popping up when saving backflush
- Fix to stop error when selecting serials when issuing stock.
- Fix to subcontract misc items (CASE 14620)
Kitting
- Fix to stop exception when changing tabs on sicon tab control for free text items.
Date applied: October 21, 2021