210.0.2
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v21 FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to update the works order quantity when changing the finished item quantitiy and updating the component quantity
- Override warehouse hierarchy can now be done on a works order line
- Fix to set the rounding cost when disassembling a kit via barcoding earlier to ensure the disassembled cost is correct
- Fix to set the qty to book column correctly for sub assemblies on the process works order screen
- Post to the works order updated message service after the base update has been completed
- Fix to stop error occurring when completing a preallocation from a subassembly when using warehouse hierarchy and the sub assembly finished item isn’t in every component warehouse
- Fix to ensure the correct default is being used for the use warehouse hierarchy on the works order line
- Select and deselect all button for traceable items on book
- Override warehouse hierarchy when no warehouse has been set on creation
- Fix to set the set the stock item as active when creating a bom from an estimate
- Fix to set the operation inspections when creating Works order from estimate
- Fix to load the inspection template correctly when changing the inspection template on the bomoperation
- Fix to the backflush screen to stop the ability to skip the validation process when clicking quickly
- Fix to throw error when sub assembly finished item doesn’t have a bin to select
- Fix to generate works orders for non built items
- Fix to run reports when the current application is null
- Importing machines through Sage creates a Sicon Machine
- Fix to set the correct due date on weekends and bank holidays
- Changed all report printing to use the client ouput mode rather than always using preview
- Fix to add all the bins, rather than the first, to the view of available bins when using warehouse hierarchy
- Fix to allow stock to be unissued after the bin it was initially issued to has been deleted
- Fix to handle stock code being different that the bom code
- Performance improvements to the operations tab and to creating works order sale summaries
- Fix to split by max batch size where an additional quantity was being added
- Fix to show Sicon team when creating operation via a Works Order using the reference correctly
- Fix to warehouse check when adding a sub assembly line to a works order
- Change to use new Projects message service for transactions
Material Planning
- Added project number to suggested purchase order reasons when reason is an operation
- Fix to why suggested stock transfers were being generated with a date before the stock was available
- Warehouse checking improvements
- Fix to how stock transfers are displayed in the future stock movements screen
- Fix to populate the quantity on order correctly
- Fix to load the itemname and reasons when running twice before closing the form
- Fix to why lead time was not being considered for suggested purchase orders
- Rough cut shouw the Sicon Team, Machine, and Machine group availabilities and demand correctly
- Material planning tab will now show in purcase orders when using MRP lite with Distribution enabled
- Performance improvements
- Fix to use the correct unit of measure for sub assemblies
- Fix to why MRP was not working correctly when running for just one item
Kitting
- Fix to read the binitem before receiving the preallocations
Date applied: June 17, 2021