Manufacturing

Back to release notes

201.0.8

Issues Resolved Important
Important Info

ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v20.1 FOR THE FIRST TIME.  THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.


Issues Resolved

Works Order Processing

  • Fix to printing sub contract despatch note when across multiple works orders
  • Fix to stop check when movement balances are deleted when unconfirmed costs are not enabled
  • Fix to showing machine resource when editing a machine line on a works order

Material Planning

  • Fix to check the Currency exchange rate type when checking to see if there are active periods
  • Fix to remove the Serial Number for finished items tab as it has been replaced by the traceable items tab

Date applied: December 16, 2020