201.0.73
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v200.0.9 OR HIGHER FOR THE FIRST TIME. THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.
TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.
Issues Resolved
Works Order Processing
- Fix to use WoQtyToBuild rathen than WoQuantity to prevent a division error that led to a lower amount of stock being added
- Pass through the currently selected bin to Allocate Stock to works order lines (CASE 17733)
- Fix to set the transaction history to BOM Build for traceable completion transactions
- Fix to correct works orders that havent posted after changing from unconfirmed costs to confirmed costs
MRP
- If BuyQuantsUseMultUnits is not being used, the UoM selection in stock selects is greyed out and the default UoM will be used (RFC 17882)
Date applied: March 3, 2022