Manufacturing

Back to release notes

201.0.5

Issues Resolved Important
Important Info

ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v20.1 FOR THE FIRST TIME.  THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.


Issues Resolved

Kitting

  • Fix to selecting the lines before getting the cost
  • Add Disassemble Components to Stock when disassembling the kit
  • Fix to keep the Kit even if it cannot allocate all of the lines to the sales order line kit when using the createKitsForSalesOrder WebAPI request

Material Planning

  • Fix to reorder level suggestions and economical batch size suggestions
  • Fix to why suggested where being grouped incorrectly
  • Fix to check the currency has an active period exchange rate set if its not the base or the euro currency when selecting the Suggested Purchase Orders in Material Planning
  • Improvements to suggested stock transfers where replenishment warehouses only have a portion of the quantity needed
  • Fix to MRP standalone where an error was thrown due to a line of text being too large
  • Fix to stop duplicate warning messages
  • Fix to incorrect column displaymember for Purchase Orders Direct To Customer UOM
  • Fix to stock item import to handle updating default supplier lead time when a supplier has been specified

Works Order Processing

  • Fix to quantity not showing when creating the Works Order from the sales order line for built/bought items
  • Added sheet setting to the Manufacutring product groups settings control
  • Total sales margin is now shown on the works order sales summary tab
  • Message stating item is buy are you sure you want to build when stock item has a works order template will no longer appear
  • Sheet calculator will now load item as sheet when it’s product group has the sheets option enabled
  • Trim and spacing defaults added to a new works order settings tab called sheet calculations
  • Fix to using quantity per run with a value of zero
  • Performance improvements to checking works order line cost when movement balances are deleted
  • Sub contracts can now be viewed after the Works Order has been completed on the Sub Contract Tab
  • Fix to timeout error when completing works orders
  • Fix to subcontract management PO tab to receive correctly
  • Increments unnecessarily when creating sub assemblies when adding new lines to an existing Works Order causing duplicate Works Order numbers
  • Sub contracts going forward can now select the other sub contract suppliers created in the BomOperation or Operations
  • Fix to use correct overhead cost when setting a fixed value on a BOM
  • Remove Serial Number tab as it is redundant due to the traceable items tab
  • Fix to traceable items when pre creating serial numbers
  • Fix to creating Sicon Inspections when the template was linked to the MSM operation and not the BOM Operation directly
  • Fix to scrapping when on a Works Order with Multiple finished Items

Date applied: November 30, 2020