Manufacturing

Back to release notes

201.0.19

Issues Resolved Important
Important Info

ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v20.1 FOR THE FIRST TIME.  THIS IS BECAUSE WORKS ORDER FINISHED ITEM TRANSACTIONS WILL BE SWITCH TO BOM BUILD TRANSACTIONS, DUE TO HOW THE SAGE STOCK VALUATION REPORT HANDLES UNCONFIRMED TRANSACTIONS.

TRANSACTION HISTORY FOR UNCONFIRMED COSTS WHERE THE NOMINAL HAS NOT BEEN UPDATED WILL HAVE THE COST VALUE REDUCED TO 0. THIS IS TO FIX INCORRECT VALUES BEING SHOWN ON THE RETROSPECTIVE STOCK VALUATION REPORT.


Issues Resolved

Works Order Processing

  • Updating expected hours calculates on an operation calculates the start and end times correctly.
  • Fix to show traceable items on complete works orders.
  • Fix to stop object reference error when backflushing a works order with a sub assembly.
  • Fix to allow issues for multiple allocations.
  • Fix to backflush to revalidate all works order lines after amending a works order.
  • Fix incorrect setting name for show delete button on process works orders.
  • Backflush validation error message now mentions if the stock has been used on a separate backflushed works order.
  • Fix to show the Sicon tab in the same place when viewing the item details from the works order as from the Sage menu.

Kitting

  • Fix to prevent status showing as allocated incorrectly when changing the kit line quantity.
  • Data fix for kits with an allocated status after changing the kit line quantity.

Material & Resource Planning

  • Improvements to the economical batch size calculations.
  • Performance improvements.
  • Fix to UOM suggestions.

Date applied: February 24, 2021