192.0.14
Issues Resolved ImportantImportant Info
ALL USERS MUST BE LOGGED OUT WHEN UPGRADING TO v192 FROM v17 OR LOWER FOR THE FIRST TIME
Issues Resolved
Works Order Processing
- Fixes to cost of sales postings made when processing serial numbered finished items
- Fix to sub contract quantities to no longer use finished item quantity by default
- Copy sales order no longer copies the barcode number
- Fix to status to calculate booked using booked quantity and scrapped quantity of the finished item
- Fix to check if a transaction already exists on a job for a works order that is not a WOP-COS and deletes it if one is found
- Fix to stop multiple estimates being created with the same estimate number
Material Planning
- Fix amend stock items button from build time screen where it wasn’t showing the stock item correctly
- Fix to overloaded tab on capacity planning to calculate using teams available time rather than total time for day
Date applied: March 9, 2020