200.0.0

Issues Resolved New Features Important
Important Info

All Hire desktop list data will automatically update intermittently when the ‘Auto Refresh’ box is ticked.


New Features
  • As PR v192.1.1, January 3, 2020
    Create service cases for hire order delivery/collection when Service module is installed and tick-boxes checked in Hire Order Maintenance.
  • As PR v192.2.2, March 26, 2020
    Hire Transfer maintenance functionality/menu option added.
    Job Costing references now named Projects, although job label name is used for backward compatibility.
  • As PR v192.3.2, March 31, 2020
    Service case assigned employee added to Settings screen ‘Service’ tab (only shown when the Service module is installed). When configured delivery/collection cases created in Service will be assigned to this employee. If no employee is configured these cases will be unassigned.
  • As PR v192.4.2 / v192.5.2, April 2, 2020
    Rapid Hire Order entry/amend screens now include Attachments and Memos tabs.

Issues Resolved
  • As PR v192.3.2, March 31, 2020
    Asset Hire Details Inspection History tab fix for ‘object reference is not set ..’ error if the examined by user has since been deleted from Sage.
  • As PR v192.4.2 / v192.5.2, April 2, 2020
    If hire suspension period includes excluded bank holidays do not reduce chargeable duration for these dates twice.
  • As PR v192.6.2, April 8, 2020
    Rapid Order Entry/Amend will now show the batch asset description if a single batch asset is assigned to a hire order line.
  • As PR v192.7.2, April 15, 2020
    Suspension/bank holidays overlay checks fix to deal with non-day (e.g. week) hire periods.
    Suspension dates now include end date when weekends are excluded.

Date applied: May 11, 2020