Common Components

Back to release notes

221.0.83

Issues Resolved
Issues Resolved
  • Added check to not include appointments with start and end dates that are set to null.
  • Added parameter to disable overlap check.
  • Corrected tab stop order on the timesheet entry screen.
  • When calculating the quantity on the timesheet line, and if there are breaks for the line, thus reducing the total hours for the line, then the quantity was calculating incorrectly. For example, if a timesheet line has a quantity of 5 and an employee worked 9 hours, but then 1 hour was taken as a break, the total hours would be 8 hours. The quantity for the line then needs to be calculated as (Quantity * (Actual Hours For the Cost Rate + Break Hours)) / Hours Entered For the Line.
    Using the above figures, this would look like: (5 * (8+1)) / 9.
  • Added a get sicon teams web api endpoint.
  • Deleted and Forrmer Employees (Projects) are not shown on the Employee Resource Scheduler (Capacity Planning) nor on the Employee tab on the Rough Cut Scheduler.
  • Fix for incorrectly removing breaks from ‘Actual’ timesheet line hours when the user is using the ‘Weekly’ work pattern.
  • updated Manufacturing datamodel.

Date applied: October 1, 2024